Remove Application Remove Capacity Remove Event Remove Outage
article thumbnail

Decrease Recovery Time for Microsoft SQL Server Disasters with Pure Cloud Block Store in Microsoft Azure

Pure Storage

The capacity listed for each model is effective capacity with a 4:1 data reduction rate. . Higher availability: Synchronous replication can be implemented between two Pure Cloud Block Store instances to ensure that, in the event of an availability zone outage, the storage remains accessible to SQL Server. .

article thumbnail

Comparing Resilience: Business, Operational, IT, and Cyber – Part Three

Zerto

IT resilience refers to the ability to continuously keep essential IT systems and applications up and running despite disasters and disruptions. Without IT resilience, most businesses will be unable to maintain critical business functions when faced with disruptive events like cyberattacks, fires, natural disasters, etc.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Oracle Database Troubleshooting and Problem Resolution with Storage Snapshots

Pure Storage

With an ever-increasing dependency on data for all business functions and decision-making, the need for highly available application and database architectures has never been more critical. . Alternatively, shut down application servers and stop remote database access. . Re-enable full access to the database and application.

article thumbnail

The Four Phases of Disaster Recovery

MHA Consulting

In today’s post we’ll look at why organizations still need to be adept at IT disaster recovery (IT/DR) and describe the four phases of restoring IT services after an outage. Phase 1: Preparation Technically, preparation is not a phase of disaster recovery since it happens before the outage. Estimate how long the outage will last.

article thumbnail

How to Set Up a Staged Recovery Environment 

Pure Storage

If you’ve suffered a breach, outage, or attack, there’s one thing you should have completed and ready to go: a staged recovery environment (SRE). This should be set up in advance, tested, and in a ready state to be transitioned into quickly after an event. To stage and orchestrate the reintroduction of critical applications.

Backup 98
article thumbnail

Pure Storage Now a 10X Gartner® Magic Quadrant™ Leader for Primary Storage

Pure Storage

Today, that same FlashArray from 2014 has 10 times its original storage capacity in just three rack units. Move any workload seamlessly, including BC/DR, migration to new hardware, or application consolidation. Mega arrays were able to shrink from 77 rack units to 12 with the introduction of FlashArray.

Capacity 140
article thumbnail

Pure Storage at VMware Explore 2022

Pure Storage

If you look back, the buzzwords of past VMware events were largely centered on the virtual machine (VM)—VM backup, VM recovery, VM granularity, VM insights. But these are less applicable than they once were because what we were really talking about was the application. 1) VM = (1) application. This paradigm has shifted.