article thumbnail

Everything You Need to Know About Business Continuity Plans

Erwood Group

Crisis Management Levels. Crisis Communications. To some, the above list is also a bit of what they would call overkill as many of these items mentioned can be placed into crisis management documents. This is also a method similar to that in emergency management as All-Hazard planning. Notification.

article thumbnail

10 Disaster Recovery Plan Mistakes to Avoid for Your Business

Erwood Group

A disaster can take many forms, such as: A cyber attack A natural disaster like a flood or earthquake A power outage A disaster recovery plan is a critical component of a business continuity plan or BCP meaning it’s essential for ensuring the survival of a business in the event of a crisis.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Business Continuity Guide for Smaller Organizations

Stratogrid Advisory

The implementation of a Business Continuity Management (BCM) Program can be a complicated and lengthy process, which directly depends on the organization's size and complexity. There is a common misconception among many small and medium-sized organizations about what the Business Continuity Planning (BCP) process entails.

article thumbnail

Business Continuity Guide for Smaller Organizations

Stratogrid Advisory

BCP Guide table of Contents: Section 1 - Introduction to Business Continuity Planning (BCP). Section 2 - Business Continuity Management (BCM) Program Implementation. 1 – Introduction to BCP. 1 – Introduction to BCP. 1 – Introduction to BCP. 1 – Introduction to BCP.

article thumbnail

The New Normal

BCP Builder

Feedback from BCP Builder Community on this topic – (this is the link to the original LinkedIn Post ): What will “the new normal” look like? An impacts-oriented all-hazards approach will be worthwhile planning going forward (as it has been in the past). The post The New Normal appeared first on BCP Builder.

BCP 52
article thumbnail

The New Normal

BCP Builder

Feedback from BCP Builder Community on this topic – (this is the link to the original LinkedIn Post ): What will “the new normal” look like? An impacts-oriented all-hazards approach will be worthwhile planning going forward (as it has been in the past). BCP’s should be written around ‘1.

BCP 52