article thumbnail

05/09/2014 The Importance of Debriefing

Plan B Consulting

I had the task, as the Emergency Planning Manager, to conduct a debrief of a multi-agency water contamination exercise involving the Local CCDC (doctor responsible for outbreaks in the local area), the Local Authority, a hospital and various people from Anglian Water. A long time ago I was involved in the water industry.

article thumbnail

05/09/2014 The Importance of Debriefing

Plan B Consulting

I had the task, as the Emergency Planning Manager, to conduct a debrief of a multi-agency water contamination exercise involving the Local CCDC (doctor responsible for outbreaks in the local area), the Local Authority, a hospital and various people from Anglian Water. A long time ago I was involved in the water industry.

article thumbnail

A Resilience Charter

Emergency Planning

All levels of public administration should be required to produce emergency plans and maintain them by means of periodic updates. Civil protection must be developed at the local authority level, coordinated regionally and harmonised nationally. The business continuity plans will function in parallel to emergency response plans.