Remove 2027 Remove Activation Remove BCP Remove Security
article thumbnail

Supply Chain Risk in Action

KingsBridge BCP

Although there are four US locks (and one Canadian), only two of the US locks are active. The new lock is expected to be completed by 2030 (or 2027 by some estimates). Department of Homeland Security study found that a six-month closure of the Poe [lock] would result in a complete shutdown of Great Lakes steel production.

BCP 52