Consolidate Oracle Workloads with FlashArray//XL
Pure Storage
JUNE 15, 2022
In the face of this , it’s physically impossible for infrastructure to remain as performant, scalable, and resilient without workload consolidation. Increased resiliency , with four power supplies operating in an N+2 redundancy configuration that can survive the failure of up to two power supplies. Figure 1: .
Let's personalize your content